Building Defect Rectification in Melbourne
Fixing Structural & Façade Defects for Long-Term Safety
Building defects can lead to serious safety hazards, structural deterioration, and compliance breaches. At Lynmore Construct, we specialize in building defect rectification, ensuring properties across Melbourne & Victoria meet National Construction Code (NCC) and Australian Standards. Left unchecked, these issues can escalate into costly repairs, potential legal ramifications, and compromised occupant safety.

Common Building Defects We Rectify
- Facade Defects – Including material deterioration, cracks, and poor sealant applications that degrade your building’s exterior, allow moisture infiltration, and compromise occupant comfort and safety
- Structural Issues – Encompassing concrete cracking, slab movement, or foundation settling that weaken the building’s stability, leading to potential safety hazards, higher repair costs, and compliance breaches if left unaddressed
- Waterproofing Failures – Covering leaks in basements, façades, balconies, and roofs that can trigger mold growth, interior damage, and long-term structural deterioration—ultimately driving up maintenance costs and creating health risks
- Fire Safety Non-Compliance – Referring to missing or inadequate fire-rated materials, passive barriers, or active protection systems that expose occupants to undue risk and can result in expensive fines or legal complications under building codes and voided insurances
Our Defect Rectification Process
Step 1
Investigation & Root Cause Analysis
- Detailed site inspection & defect audit
- Engineering assessment to determine cause of failure
Risk mitigation strategy
Step 1
Step 2
Design & Engineering Consultation
- Engagement of structural engineers, facade specialists & waterproofing experts
- Development of certifiable rectification plans
- Permit applications & approvals
Step 2
Step 3
Execution of Defect Remediation Works
- Structural strengthening & repair
- Waterproofing system replacement
- Façade remediation & material replacement
Step 3
Step 4
Compliance Certification & Ongoing Maintenance
- Handover of as-built documentation & warranties
- All rectification works undergo final inspections and are certified in line with Victorian regulations, ensuring peace of mind and legal compliance
- Compliance with Victorian building regulations
- Support through 12-month defect liability period